Kirkland owners can use a City plan, change a private stock plan or order a custom design. The right choice depends on more than floor area. Slopes, trees, access, utilities, critical areas and the layout can erase a plan saving.
This privately operated guide has no affiliation with Kirkland’s government, plan authors or builders. Check the current program and parcel with Planning and Building.
What does Kirkland say about pre-approved DADU plans?
Kirkland’s Housing page says the City offers a pre-approved DADU program. It describes the plans as a faster, cheaper path. The designer may charge a plan fee of up to $1,000.
That plan fee is only one cost. Check the current plan list, code year, designer agreement and allowed changes. Then list the site work and documents still required.
How should a Kirkland plan be tested against the lot?
Prepare the parcel and existing-house details. Then place the planned footprint on a current survey or reliable site plan. Review:
- yards, lot coverage and building separation.
- mature trees and root-protection areas.
- slope, retaining walls and drainage.
- streams, wetlands, shoreline or other critical areas.
- alley, driveway and side-yard work access.
- sewer, water and electrical routes.
- roof drainage and stormwater treatment.
- outdoor privacy for both dwellings.
A plan may fit on paper but cost too much to dig or connect. Use the early site checklist before buying the plan rights.
What if the pre-approved plan needs changes?
Ask which options are already part of the reviewed plan. A mirror image, moved window, new roof or different foundation may need more design and review. A change may improve access, protect a tree or fit the household. Price it before choosing.
Compare:
- Plan royalty and designer service.
- Site plan and survey.
- Foundation adaptation.
- Energy and building-system documents.
- Utility and drainage design.
- City corrections.
- building and finishes.
The pre-approved plans versus custom guide keeps those rows visible.
Which permits and reviews may apply?
The path depends on whether the unit is detached, attached or a conversion. Critical areas or shorelines can add review. The design team should list building, planning and trade permits, plus any utility or street work.
Ask who prepares the site plan, structural and energy details, responds to City comments and updates the building set. A pre-reviewed building design does not remove site or trade planning.
Read the design and permits guide to define duties before requesting a fixed building price.
What utilities and site work should be included in the price?
Map the side sewer or connection path, water service, electrical equipment, heating system and drainage. Check whether excavation equipment can reach the footprint and where materials will be staged without blocking the occupied house.
Sloped lots can add soil support, retaining walls or erosion control. Trees may affect access and placement. Put trenches, utility fees, paving and yard repairs in the quote. Do not assume they are inside “construction.”
The utilities guide supplies a quote checklist.
How much should a Kirkland ADU budget include?
Use the Seattle-area cost guide as a category schedule. The plan-program royalty may reduce a small part of design cost. The site, foundation, building, utilities and finishes still need site-specific pricing.
Ask for separate prices for the site check, survey, plan fee, design, engineering and permits. Add site protection, digging, foundation, shell, systems and finishes. Keep outside repairs and money for surprises visible. Do not compare a shell price with a move-in-ready quote.
How should Kirkland builders be compared?
Check the legal builder through Washington L&I. Ask for recent Kirkland ADUs or similar projects and whether the same team handled permits and construction. For a City plan, ask if the company has used that exact design and what site changes it needed.
Give companies the same plan option, site details and finish schedule. Use the builder comparison guide to normalize registration, project proof, design duty, utilities, allowances, exclusions, payment and written warranty terms.
Build a Kirkland plan-fit memorandum
Before buying a City plan, ask for a short written fit report. It should name the plan version, allowed options, direction, foundation, site plan, energy records and utility layout. List any change that could remove the faster review path.
Attach a site sketch with setbacks, access, trees, slopes, drainage and utilities. List open City questions on their own. This lets builders price the same design and keeps a low plan fee from hiding site or expert work.
How should permit corrections and plan rights be handled?
The agreement should say who may edit and own the plans and who answers Kirkland comments. Check whether the plan rights are tied to one site or builder. State what happens if the owner changes builders after the permit.
Keep the issued set, correction responses and approved revisions in the owner’s file. Before building, compare them with the priced drawings and resolve every material difference in writing.
Save the plan designer’s contact details and the dated City program page. Use them to check the right plan version later.
Frequently asked questions
Is a Kirkland pre-approved DADU plan already permitted for my lot?
No. The building design may have completed part of review. But the site still needs site approval and property documents.
Is the plan royalty the complete design cost?
No. Site planning, foundation adaptation, energy work, utilities and permit responses may be extra.
Can the plan be changed freely?
Do not assume so. Confirm reviewed options and the effect of changes with the designer and City.
Does this guide guarantee a Kirkland company?
No. Current territory, capacity and project fit are checked separately.